We have been working on this new project since August 2011, when we opened our new Service Center. We will be combining our Parts Business and our Service Center
into one location and one new name, CHP Motorsports. We are hoping that by September 1, we will be open for business at our new 15,000 Sq Ft. facility located on Hwy 110s,
One of the major Highways for Tyler. We will have our showroom with our vintage bike collection on display as well as our Full Service Center, Full Machine Shop and
Dyno Tuning, our full line Parts Business, as well as Restoration Services. Check back in from time to time and follow our progress.




This was our new property on March 15th, when we closed. As you can see we had to remove

two existing building and one House at the rear of the property.


The two front buildings demo'ed, May 1st.



Most of the trees removed, leaving only the house at the rear of the property, May 15.

Staring dirt work for new foundation, May 24.


Dirt work finished, ready for batter boards and plumbing ruff in, May 25.

Rear half of slab poured and plumbing ruffed in, June 13.

Complete slab poured, starting to hang steel, June 21.

View of the building from the rear showing loading dock. Building about 1/2 erected, June 25th

Starting to erect the 2 story part of the building, just about 1/2 way through the framing process. June 25th
 

June 26th, Steel frame about 3/4 finished.

Warehouse and Service Center parts of framing finished, Only showroom on front left for framing, June 26th

June 27, the Showroom and front portion of the building is close to being framed out.
The pictures below reflect our progress as of July 19th. Sorry about the gap in the time line, the photographer was on vacation.













July 30, Front doors installed, waiting on E.F.U.S. and Window glass.


August 1st, Framing out the 2 story offices


Finished blowing in our insulation and decking the second floor of our offices, Aug 10th


Looking forward from rear of building inside. Staring second floor of building Monday.

Front of building with first two layers of EFIS applied. Aug 10th


As of November 10th, we are about 1/2 way moved in so please be patient with us during our move over. These pictures are for Dennis Dillman.


The picture above and the 2 below are pictures from upstairs looking down onto the lobby/showroom



Following pictures are of the up-stairs portion of the offices.




These next pictures are of our full line service center





Pictures below are some of our parts shelving in our warehouse. We have not moved our inventory into the warehouse yet.



Below, General warehouse pics, Excuse all of our junk, we have not had time to organize.








Below are out side pic of our new facility as of November 9



More lobby pictures. We have just started to work on the lobby as time is permitted.



Pictures below are of our Machine Shop area, we are about 1/2 moved in.



Dyno room below
Making a little progress with window dressing for the showroom







Up-Stairs details



Service center