We have
been working on this new project since August 2011, when we opened our new
Service Center. We will be combining our Parts Business and our Service
Center into
one location and one new name, CHP Motorsports. We are hoping that by September
1, we will be open for business at our new 15,000 Sq Ft. facility located on
Hwy 110s,
One of the major Highways for Tyler. We will have our showroom with our vintage
bike collection on display as well as our Full Service Center, Full Machine
Shop and
Dyno Tuning, our full line Parts Business, as well as Restoration Services.
Check back in from time to time and follow our
progress. |



 This was our new
property on March 15th, when we closed. As
you can see we had to remove
two existing building and one House at
the rear of the property. |
 The two front
buildings demo'ed, May
1st. |


 Most of the trees removed, leaving only
the house at the rear of the property, May
15. |
 Staring dirt work for new
foundation, May
24. |

 Dirt work
finished, ready for batter boards and plumbing ruff in, May 25. |
 Rear half of slab poured and
plumbing ruffed in, June
13. |
 Complete slab poured,
starting to hang steel, June
21. |

View of the building from the rear
showing loading dock. Building about 1/2 erected, June
25th |

Starting to erect the 2 story part of
the building, just about 1/2 way through the framing process.
June 25th |

June
26th, Steel frame about 3/4 finished. |

Warehouse and Service Center parts of
framing finished, Only showroom on front left for framing,
June 26th |
 June
27, the Showroom and front portion of the building is close to being
framed out. |
The pictures below reflect our
progress as of July 19th. Sorry about the gap in the time line, the
photographer was on vacation.












 |
July 30, Front doors installed,
waiting on E.F.U.S. and Window glass.

 |
August 1st, Framing out the 2 story
offices

 |
Finished blowing in our insulation
and decking the second floor of our offices, Aug 10th
 |
Looking forward from rear of building
inside. Staring second floor of building Monday.
 |
Front of building with first two
layers of EFIS applied. Aug 10th

 |
 |
As of November
10th, we are about 1/2 way moved in so please be patient with us during our
move over. These pictures are for Dennis Dillman.

The picture above and the 2 below are
pictures from upstairs looking down onto the lobby/showroom


Following
pictures are of the up-stairs portion of the offices.



 These next pictures are of our full line
service center




 Pictures below are some of our parts
shelving in our warehouse. We have not moved our inventory into the warehouse
yet.


 Below, General
warehouse pics, Excuse all of our junk, we have not had time to
organize.







 Below are out side pic of our new facility
as of November 9


 More lobby pictures. We have
just started to work on the lobby as time is permitted.


Pictures below are of our
Machine Shop area, we are about 1/2 moved in.


 Dyno room
below
 |
Making a little
progress with window dressing for the showroom






 Up-Stairs
details


Service
center





 |